Transmission Gully

PHOTO: Transmission Gully

With less than six months to go till the Transmission Gully motorway opens to traffic, the paving teams are hard at work putting the layers of paving on the road. The paving on Transmission Gully is made up of both granular pavements (with chip seal surfacing) and structural (deep lift) asphalt pavements. Take a look at how our structural asphalt pavement is made in the video below.

MOST POPULAR