PHOTO: Transmission Gully
With less than six months to go till the Transmission Gully motorway opens to traffic, the paving teams are hard at work putting the layers of paving on the road. The paving on Transmission Gully is made up of both granular pavements (with chip seal surfacing) and structural (deep lift) asphalt pavements. Take a look at how our structural asphalt pavement is made in the video below.
MOST POPULAR
- Auckland real estate agent guilty of misconduct – struck off for 18 months
- Real estate agent found guilty
- Australia’s sexiest real estate agents | A carefully curated catalogue of the hottest agents
- Abandoned land for sale
- Grand Designs New Zealand | Medieval Castle – WATCH
- New NZ Tax Rules | Brightline Test & Tax Deductibility | What Should Property Investors Do Now? | WATCH
- Take a look inside Foodstuffs’ new storehouse, the size of eight rugby fields | WATCH
- ‘Labour party’s got no idea’: National MP knocks down Govt over ‘rubbish’ housing claims
- Inside the bitter break-ups, shock arrests and lost fortunes that have plagued contestants on The Block Australia
- The simple way a husband and wife defrauded Bunnings of $270,000 | AUSTRALIA